P6 to P3 and back to P6
All, I have a contractor that is using P6 and P3 to build out a design build schedule. Besides the character limitations, what are the major issues I need to look for? I really need this scheduler to move to release 8.3 but would like to have concrete info on the issues to be expected when going back and forth between versions.