Service contract breaks for ATO model
Hi
We have an issue with service contract breakage when * items received for repair in depot repair module. High level process is
1. -Item is sold to a customer with sales order
-ATO Model is entered to the SO
-ATO Model is configurated
-Item is manufactured
-Item is shipped out: This is where the warranty contract generates
-Item is received into depot repair process. The receiving is done to the *item. In the receiving phase the link between *item and ATO model breaks. At the same time the *item loses WAR contract linkeage
Any workarounds available for this
Thanks in advance