PR to PO generation With Multiple Exchange rate for same supplier
Hello
Does anybody know why when creating a non -stock purchase order from a non-stock requisition, if 2 orders combined, same currency, same supplier, but different exchange rate will be combined.
Currently there are two PO generated on the based on the exchange rate
But I want only one PO to be generated
how to achieve this (the Exchange rate to be considered for the date of PO generation I.e today's exchange rate from the system)
Please Assist
JDE Version 9.1 update 4
Thanks
Raja