What method can use to apply PSR 11.2.0.4 to OracleDB 11.2.0.3(BP5) on EXADATA Database Machine
Hi all
I have plan to applying a patch to Oracle Database, Oracle Grid Infrastructure and Exadata Storage Server Software on Exadata Database Machine(X2-2).
That plan is PSR upgrade, DB11g2 11.2.0.3.5 to DB11g2 11.2.0.4.1.
So, what method can use with upgrade database with my environment.
Follow the content of 'Oracle Maximum Availability Architecture White Paper May 2012' ,
I decide to use 'Database Rolling Upgrade Using Transient Logical Standby: Oracle Data Guard 11g'
Do you have any tips on this topic.
Best regards.