Army Corps of Engineers required codes for cost-loaded P6 schedules

edited Jul 28, 2021 9:23PM in Primavera (MOSC) 4 commentsAnswered ✓

I have found conflicting information on the codes that are required for a cost-loaded schedule to work with the ACoE's QCS/RMS.

What are the correct codes and code lengths that must be used with an ACoE cost-loaded schedule?

Thanks,

Rob