There is a requirement to have a one to one relationship between Requisition/ISO and Planned order r
Hi Gurus,
There is a requirement that each ISO can only have one item in it. Having multiple items in one delivery causes shipping delays out of the make sites, as more often than not there is an item missing and the whole delivery either has to be backordered or wait until all materials have been found to perform the shipment.
For this we tried two methods:
1. Set the profile MRP:Requisition Load Group Option on ASCP side only, then source side only and finally both sides ASCP and Source instance but each time single requisition gets created if item is same and released together.