Migrate a DB from Oracle SE 11.2.0.4 non-RAC to Oracle SE 11.2.0.4 2-node RAC
Hi Expert:
As I am new to RAC, it will be great if there is any doc / tech notes (or even related discussion threads) that I can reference to get more details on the actual implementation.
Currently, I have a production DB running on 1 server (Server-1, Oracle 11.2.0.4 SE, non-ASM) . I have 1 new server (Server-2) to form a 2-node RAC (also Oracle 11.2.0.4 SE) with Server-1.
After reading some documentation, it seems that I need to do the following steps to perform the actual migration. Please comment and this is correct or if there are better ways to do this to minimize interrupt to production DB.