11.5.10.2 : Oracle Recommended Way of Applying Patch on R11i Where Application is Divided on Two Nod
Hi,
In our Oracle Apps 11i Production Environment, we have two server machines with the following configuration
Oracle Application Version: 11.5.10.2
Oracle Database Version: 9.2.0.6
OS Platform: Red Hat Enterprise Linux AS release 4 (Nahant Update 4)
Server Architecture: 32 bit
On server machine 1: Application (Forms + Web)
On server machine 2: Application (Concurrent Manager + Admin) and Database
We configure our TEST server by merging appl_top and clone the Production server on a single server machine where application and database is on the single machine.
The problem is that during we applied patches (7627832, 5609399, 14242358, 18413199 ) on TEST server successfully and the forms version were upgraded successfully and the problem was resolved so i applied the same patches on the Production server machine 2 (Concurrent Manager + Admin + Database) and the patches were applied successfully but the forms were not replaced and compiled and most forms in AP schema were throwing error of "ORA-04062: The signature of the Package has changed" type.