How to move one pool in head1 to head2?
Hi,
I have one head of ZS3-2 with 2 disk shelf and two pools one for each disk shelf, and I want to add other head and configure in cluster (Active - Active) and I need move one pool of head1 to head2 for this configuration.
How I can do this action?
Is recommendable move this pool?
Which are the step for this configuration?
Thanks.