Hi support team, please can you help me with this cost components qustion.
I need to find a way to have a flat OH rate assign to each cost center to facilitate the cost revision process. The STD cost has 4 Cost components in which Material and Scrap are driven by the BOM. Labor and OH is driven by the Run Rate loaded in the Router for this particular part number. The system multiplies the Run Rate time the WCTR Rate to get the total cost. I would like to add a Cost Center Rate independent from the Run Rate. This is to be able to assign 1 flat rate to each WCTR