what is default schedule time of cost manager in r12
Hi Experts,
i want to schedule cost manger in my application but i don't know at what period (time interval) i can schedule cost manager. i schedule cost manager with the option AS SOON AS POSSIBLE and it is schedule with 30 min time interval periodcally.
so plz suggest me at what time interval i can schedule cost manager.
EBS - R12.1.1
os - rhel 5.4
regards
pritesh ranjan