Is it possible to schedule BIP reports in Siebel 7.8.2.16
Hi All,
Can someone share some document to achieve scheduling in Siebel 7.8.2.16. (if its possible) we have it integrated with BIP 10g.
I saw this doc (Siebel Reports Guide) and understood that its available only from 8.1.1.10 open UI.
Please provide some inputs..
Thanks in advance.