EBS Upgrade deployment to PROD with minimal Downtime
EBS Upgrade deployment to PROD with minimal Downtime
Just to explain the scenario to you so as to understand
the best was to do the data clone.
PROD: Apps is 12.0.4 (10.1.2.0/10.1.3.0/Java 1.5) and DB
is 10.2.0.5.
(Source OS is AIX-5.3 -64 bit)
DEV: Cloned from PROD and Upgraded to: Apps 12.1.3
(10.1.2.3/10.1.3.5/Java 1.6) and DB to 11.2.0.4 (Target OS was AIX 6.1
-64 bit)
Now once DEV is Certified OK, I want to do a clone of DEV
onto NEW_PROD on a brand new box (AIX 6.1 - 64 bit).
In the meantime original PROD is being used and data
updated.
However at some point I will get a CODE & DATA FREEZE ON PROD