Updating a system with corrected provision date
HI we have OSM 7.0.3.1020 with O2A PIP installed in our production environment.
Right now we have two provisioning systems, one with a synch and asych responses (system A) and one with a synchronous response only (system . The synchronous response from system A completes first then the synch response from system B completes. System A also has an asych response which happens later. However the issue is that later when the async response from system A comes in, the actual due date may be different from the expected due date. Therefore system B which has already processed needs to be updated with the due date of the async response from system A. Is there a way to do this in OSM?