question about takeover/failback with lots of projects (over 960 projects) on ZS3-4 cluster
Hello Experts !
I have to plan to install the ZS3-4 cluster (A/A).
This ZS3-4 will have two pools.
Each pool has 400TB and 200TB (Usable), total 600TB.
I design to set the 320TB / 160TB for sharing (by 80% usage recommendation guide).
So 480TB (usable) in both nodes.
Cu wants to assign 500GB size per each file system.
One node has 640 file systems and other has 320 files.
This systm will be replicated to other ZFSSA in near future.
So I have considered to assign 1:1 (1 project to 1 file system). I consider the remote replication by project base.
As I knew that replication is recommended to use project based than share-based.