Hi,

I have a MRP requirement of x item (Buy) is 20 qty and the economic order qty is 100. if the requirement changes to 110 qty then my economic quantity would be 200 qty.

How to capture the scenario in MRP and what are the setup steps to achive the same when I fire po requistion of 20 qty and the requisition quantity automatically changes to 100 qty since my

economic quantity is 100.

Thanks,