Best Upgrade Process to Reports 11.1.2.2
We currently have several servers running the following configuration:
JDK 1.6.45
WLS 10.3.5
Reports 11.1.2.0
We would like to upgrade these systems to use the following components:
JDK 1.7.72
WLS 10.3.6
Reports 11.1.2.2
The different certifications/installation procedures are kind of confusing, and the last time I attempted this, it resulted in a failed Reports 11.1.2.2 installation. I was wondering if anyone could give me the best way to upgrade these systems so that everything runs afterward, or is this configuration not possible without doing a clean installation?