Cost update for 1.15lakh items for 5 resource codes
Hello All
1.15lakh items need to be updated with new costs for 'material','material overhead', 'resouce','resource overhead' and 'outcost'
can somebody please tell me the mandatory fields for the inserts for these resource codes. and also an optimised way of updating these costs.
Thanks in advance.