Hi,

In 9.1 tools 9.1.5, I have a set of 3 items using the same WC, Routings have the same time, same WC same TBC =4 , same Crew size, same manufacturing leadtime level. I could have used a master routing on them.

R30822A calculated the LTPU and LTLV on both of them but not on the 3rd one.

LTCV is populated for the 1st two but not the 3rd one.

LTCV is populaled by R30822A what could make that it does not calculate? What are the consideration or restrictions?