12c rac
HI -
Please let me know how long it generally takes to migrate a non-RAC 2TB 12c database to 2-node Oracle RAC 12c on veritas shared storage. I am looking at PROD downtime needed and not on pre-installation of RAC or any other tasks that can be done while database is up.
Thanks.