Multiple Rate Schedule Doc Types
How do I setup MRP (R3483) and S&D Inquiry (P4021) to recognize multiple Rate Schedule Doc Types? We use S&D Inclusion rule set MRP in R3483 and P4021. I have added the desired doc types into the processing option of P34004 and selected the correct statuses. When running MRP or inquiring on S&D, only the SC rate schedules are used in the calculations, In both, there is a processing option to specify Rate Schedule, but only one can be entered, not multiple doc types similar to the forecast processing option.
Thanks,
Jeff