close OPM period with WIP batch states
hello,
can I close the OPM period with WIP batch states and the system calculate the PMAC cost normally for produced quantity , because some batches still in WIP for 2 periods and cant close it.
EBS 12.1.3
2
hello,
can I close the OPM period with WIP batch states and the system calculate the PMAC cost normally for produced quantity , because some batches still in WIP for 2 periods and cant close it.