Why are our lines from projects in Post and not Merge status
We have define projects with tasks and the tasks are defined as assets
when we interface projects with assets, these lines are showing as POST and not MERGED,
Oracle User Guide indicates
You run the Interface Assets process in Oracle Projects to send asset lines to Oracle Assets. This process creates a mass addition line for each asset line in Oracle Projects. It then merges all mass additions for one asset into a single parent mass addition line. All of the mass additions appear in the Prepare Mass Additions window. The merged children have a status of MERGED.
Did we not set things up correctly or do we need a patch?