Manufacturing Scheduling process Schedule Discrete Jobs is completing with Warning
When accessing Oracle R12 EBS Manufacturing Scheduling, we are running the Schedule Discrete Jobs Concurrent Request and it is consistently completing with a Warning. Below if the Log File.
+---------------------------------------------------------------------------+
Manufacturing Scheduling: Version : 12.0.0
Copyright (c) 1979, 1999, Oracle Corporation. All rights reserved.
WPCWFS module: Schedule Work Orders
+---------------------------------------------------------------------------+
Current system time is 05-MAR-2015 17:11:03
+---------------------------------------------------------------------------+
Page Length = 55, Page Width = 132
===================================================================
Debug Mode : Disabled
Output to Terminal : No
Argument Method : Database Fetch
Trace Mode : Disabled
===================================================================
Argument 1 (ORGANIZATION_ID) = 121
Argument 2 (SCHEDULING_MODE) = 2
Argument 3 (WIP_ENTITY_ID) = -1
Argument 4 (SCHEDULING_DIR) = 2
Argument 5 (MIDPT_OPERATION) = -1
Argument 6 (START_DATE) = -1
Argument 7 (END_DATE) = -1
Argument 8 (HORIZON_START) = -1