Can ASCP consider Supply Suinventory as a constraint for supply to demand
Hi
Supply Subinventory assigned at BOM level to be considered by ASCP. This is required to restrict demands for components in the BOM to peg only supply subinv assigned at BOM Level.
Is this possible.
Thanks
Viswa
0