Message L MRP
JDE isn't generating the Message Type "L" for the items set with the Order Policy to the type 4 - Periods of Supply in the Branch / Item. When we change to the type 1 Lot by lot, JDE generates the "L" message. Do anyone know if it is a limitation of the JDE?