Change over time in WIP-Where do we set
Hi,
1) In the Discrete MFG process, there 2 operations. In between there is a change over time or cleaning up time.
Where do we capture these change over or cleaning timings?
2) If i have 2 simultaneous operations, how do we handle them in routing?
Thanks,
Jey