In upgrading from 11.2.0.3 to 11.2.0.4 should I apply the April CPU's before or after the upgrade?
I intend both upgrading the dB from 11.2.0.3 to 11.2.0.4 and also applying the APril CPU patchset. This is in keeping with Steven Chan's post at https://blogs.oracle.com/stevenChan/entry/apr_2015_quarterly_upgrade
Does it matter if I apply the CPU's before the upgrade of the dB?