Copy Standard cost (R30890)
Hi All,
I have a situation with the cost copy report.
The current situation is, that we need to specify the BP, for which we need the cost to be copied – we have to do it BP after BP. Is it possible to change this so that we could specify more branch plants in one step?
The same is for Year End – We would need to copy all BPs (one by one) to 68 bucket (over 100 BP’s)
Is there a way to do it massively?
Thanks
Alec