Copy Standard cost (R30890)

edited Jul 26, 2015 10:32PM in Manufacturing - JDE1 (MOSC) 4 commentsAnswered

Hi All,

I have a situation with the cost copy report.

The current situation is, that we need to specify the BP, for which we need the cost to be copied – we have to do it BP after BP. Is it possible to change this so that we could specify more branch plants in one step?

The same is for Year End – We would need to copy all BPs (one by one) to 68 bucket (over 100 BP’s)

Is there a way to do it massively?

Thanks

Alec