P17732 - Work Center Rates have not been defined
In P17732 we are adding a routing for a particular item. We have established labour rates for each work center and have defined a number of Cost Component values for the simulated costs (09-Actual). When we try to add any routing step, with or without the cost component, we are getting a message that the Work Center rates have not been defined.
The Work Center exists in P3006
The Cost Components are set up as simulated for 09 as follows:
CC Description Simul Net Add Simul Net Total
B10 Mechanical Labour 100.0000 100.0000
B20 Electrical Labour 100.0000 100.0000
C3 Labor Variable Overhead 11,661.3000 11,661.3000
C4 Labor Fixed Overhead 6,489.0000 6,489.0000