How do I split an LPN while in Receiving?
I want to receive an Inbound ASN into a single Master LPN so that the entire LPN contents can be moved together from one Receiving subinventory to another Receiving subinventory during an operation plan, then split to individual, palletized LPN's for put away. The purpose is to allow a container or trailer of product to be received into a trailer spotting area. The LPN representing the trailer will be moved to a dock door for unloading. As the product is unloaded, it needs to be separated for the original LPN into separate LPN's for put away.