Verification of two task procedure about online disk shevles addition and cabling. (ZS3-2, 4x4 1 HBA
Hi, Experts !
I would like to ask two scenarios for disk shelves addition without system downtime.
About cabling diagrams and task procedures.
Customer data service is VDI service as SAN with ZS3-2 Cluster. (FC connection)
There be heavy I/O on disks for service.
By standard ZFSSA cable guide (refer to http://docs.oracle.com/cd/E51475_01/html/E53670/gofbv.html#AKSCGgofef), we have to choose the scenario #1.
I would like to verify the scenario #2 cabling.
Is it no problem ? Or not recommended ?
Please advise me two each scenario and tips about risk.
Scenario #1 (Cable relocation + Add same pool) / Refer to Figure A.