Is anybody using Serialized product with License Plating in an Advanced Warehouse environment? If
When a finished good comes off the production line it is assigned a serial number for tracking and warranty purposes. Once the serial numbers are packed on a pallet the pallet is then assigned a License Plate number. From production the LPN is moved to shipping and then moved to the DC which is a different Branch Plant number using the P46L10 with IT transfer option. This is done by transferring the LPN to a truck location assigned to the DC BP.
Once at the DC the LPN would have a putaway request created using the R46L140 batch job. Again, since these are all on a LPN the putaway should be simple to manage.