E1 Warehouse Management
Hi,
is it possible to use E1 Warehouse Management (G46) between two warehouse (products are in warehouse A, and docks in warehouse
I was thinking about using 2 phases picking:
-the first phase will be from the location A1 to a staging location in warehouse A
- the second phase from this staging location in warehouse A to a dock in warehouse B.