WAVE Planning
HiAll
Can you please provide some more details about the follwoing
When we will use Availability Check, Rule Based Planning
Availability Check: The system considers the total on-hand availability of an
item when performing fulfillment and labor planning. It does not consider
existing low-level reservations.
Rule Based Planning: The system runs a simulation of the material allocation
process and simulates the WMS rules engine to determine planned fill rate. If
you select rule based planning, then crossdocking criteria will also be
considered in planning
Thanks
Ram
Tagged:
0