Overhead calculations based on OSP resources during WIP job
Hi,
We have a requirement where the overheads need to be calculated on OSP resources during the WIP job. There are multiple operations where the OSP is incurred. For every OSP resource used in an operation the OH should be a percentage of the OSP resource cost.
Also where should the setups be done to achieve this? Do the overheads get calculated only during roll up process or at the time of WIP completion ?