Is it possible to raise the project cost baselined budget upon PA Invoice send to AR?
Hi,
We are using work/work based revenue and billing method in PA. Revenue interface to GL is unchecked as per user requirement.
Budget control and GL integrated (top down) featured enabled.
Requirement is to raise or increase the project cost budget upon release and interface to AR.
In GL, upon release to AR and GL the funds available would be increased. The same increase in funds as a result of the project billing invoice accounted, to be raised in PA for the same project/task.exp. type (resource) combination as per source expenditure which was the source of the project invoice actually.