This question is about properly setting up item cost for floor stock items.

edited Oct 27, 2015 10:02AM in Manufacturing - JDE1 (MOSC) 2 commentsAnswered

In Oracle Doc 862262.1 the section titled "Cost Ledger (P4105)" says:

"Establish a cost method other than the one used for inventory items that will be included in standard costs.  For example, if 08 cost method is used as the purchasing cost method for items that are rolled up into standard costs, create and use another number for bulk/floor stock items (use a number greater than 19).

If the same cost method is used for floor stock, the cost of these items is included when standard costs are established.  Since floor stock items with the setup described here are never issued, a material variance will always be generated."

Howdy, Stranger!

Log In

To view full details, sign in to My Oracle Support Community.

Register

Don't have a My Oracle Support Community account? Click here to get started.

Category Leaderboard

Top contributors this month

New to My Oracle Support Community? Visit our Welcome Center

MOSC Help Center