Lot Costs same for Products yielded in different steps
Hello,
I am currently setting up a new 12.2.4 instance for OPM.
The requirement is to use Actual Lot Costing with the alternative cost method as PMAC. With a single raw material ingredient, we get 1 main finished product and other 5 co-products.
3 out of these 5 co-products are yielded as intermediaries at the end of the 1st step, and the main product and other 2 co products are yielded at the end of the 2nd step i.e end of the batch.
I have defined the formula with 1 Ingredient and 6 Products since we need to cost all the co-products based on actual costing.
I have defined 2 operations using 2 different resources with different costs and used them as 2 steps in the routing, and defined the relevant step/material associations in the recipe.