Outside Processing *op1 - Items
We have an intermittent problem when a version of R31410 is used to attach a Routing which has been set up for Outside processing.
Our default setting for the Lot Process Type in the Item Master is 1 i.e. Lots assigned using date.
Occasionally we find that the Lot process type of the *OP1 Item is Blank
Any ideas why this is happening?