Depot repair - CSD WIP job is populated with CSD Job number in the Lot number field
Hi
Im in R12.1.3 and trying to test the flow .
Test results of LIQLOT item (Full lot enabled item)
Step 1: Create a Repair order for Lot control item
2.While receiving the RMA line of the Repair order input the Lot number(TN001)
3.When WIP job is created from Depot repair,there is no provision to enter the Lot Number in the Job and noticed the Lot number field in this Job is populated with the CSD WIP job number .
4. Why is the Lot number field not populated the Actual Lot number received?
5. Also we use Oracle MES (part of WIP) for technician to record their labour time and record materials.