Does CRP (R3382) generate planned load hours for production number controlled item MRP Messages?

edited Dec 26, 2015 10:00AM in Manufacturing - JDE1 (MOSC) 3 commentsAnswered

We are upgrading a client from Xe to E1 9.1 and wanted to include the production number feature as a part of the upgrade.  We are performing unit tests currently and while testing the CRP generation (R3382) we discovered that there were no Planned Load Hours generated for the production controlled items.  The only way the system would generate a planned load for the top level parent items was to run MRP (R3482) with a generation type 1 Single Level DRP/MPS and immediately run CRP against those messages.  When I run multi-level MRP using generation type 4, CRP does not

Howdy, Stranger!

Log In

To view full details, sign in to My Oracle Support Community.

Register

Don't have a My Oracle Support Community account? Click here to get started.

Category Leaderboard

Top contributors this month

New to My Oracle Support Community? Visit our Welcome Center

MOSC Help Center