How to set up Operation Status (OPST) on P311221 for quality management
Hi everyone,
I need your help to set up Operation Status (OPST) on P311221.
The operation status should be 35: "Waiting for Inspection" after completing work order and i will enter test results.
When i enter test results, operation status should be 40:"Inspection Completed"