We're planning to migrate Oracle EBS APPS/DB into another server. The current server is HP-UX itanum and the new server the same.
I have been through document 438086.1 i have a few question about this task:
1- Can we perform full cloning and proceed with steps using mentioned above document without installation application tier technology stack (point no 6 Migration Section).
2- If the mentioned above is valid, Can we still be able to proceed without performing (1,5 in Migration Section)