Change OS date in a RAC 10g on ODA
Hi :
Currently, the time gap is about 5 minutes,and the 2 nodes rac cluster db is runing.
I need to change date the operating system, maintaining consistent server time and the actual time for the rac.
Do I need to restart the database, clusterware, and/or operating system?
If without downtime,
1. Which solution is appropriate and MOS documents can reference it?
2. What are the points for attention?
3. what are the steps detailed information ?
-------------------------------------------------------------------------
ODA X4370 M2
OS : 64-bit Red Hat Linux 2.6.18-274.el5
Oracle Database 10g Enterprise Edition Release 10.2.0.5.0 - 64bit
Oracle Clusterware 10.2.0.1.0
Oracle Database 10g Release 2 Patch Set 4 10.2.0.5.0