SC4.x Resource Control(s) in Resource Groups(RG) Options / Best Practices
All,
Im in the process of setting up an Enterprise wide HA-NFS solution on two(2) T5-4's with SC4.x installed/configured in the "control" domain. Since HA-NFS is NOT ready for Zone Clusters, all of the HA-NFS RG's will need to configured on the control domain.
What would be the most efficient way to maintain resource separation between the HA-NFS RG's??? There could be close to 30-60 RG's configured.
V/R, Tom