Hi,

I need to select/chose single machine from five machines when I start a batch to produce product using a common recipe.

Example:

my recipe is xyz111

My machine is M1,M2,M3,M4,M5. All can be use to produce product xyz111.

Requirement: I want to chose right machine when I start my batch using xyz111 recipe to produce xyz111 product.

How can I chose M1/M2/M3/M4/M5 whenever I prefer?

Regards

Message was edited by: mir Hi, Any expert over here to answer ??? Regards, Mir