Hi, Need help, Can any body please tell me that how PMAC calculates the item cost
I have created a batch.. Two ingredients are involved for making the product.
Ingredients
CHOCOLATE SYRUP 10.15841(On-Hand balance)
CHOCOLATE WATER 10.15841(On-Hand Balance)
Product
CHOCOLATE FG 24(On-hand balance)
I have created a PO Of the above ingredients of quantity 20(both) at rate of 200.
Then i received the quantity in the same subinventory where the above ingredients are already exists.
Now,the quantity of the both ingredients in the subinventory are 30.15841.
Then i have created a batch in which i gave 15 units of product in product quantity tab(Required).
7.5 units of each ingredients are used to make the above quantity of the product.