Mould planning with production line

edited May 21, 2016 5:08AM in Process Manufacturing - EBS (MOSC) 1 commentAnswered

Hi all,

scenario: 1

1 castingA is produced by 1 mould A with production line 1

scenario: 2

1 casting A is produced by 1 mould A with production line 2

scenario: 3

2 casting A is produced by 1 mould B (double cavity) with production line 1.

How to capture this kind of scenarios in Opm in combination with ascp.