Mould planning with production line
Hi all,
scenario: 1
1 castingA is produced by 1 mould A with production line 1
scenario: 2
1 casting A is produced by 1 mould A with production line 2
scenario: 3
2 casting A is produced by 1 mould B (double cavity) with production line 1.
How to capture this kind of scenarios in Opm in combination with ascp.