Support required from OPM Community for the idea "Lot Cost method must support yield cost calculatio
Hi OPM Community members,
I have created an idea like "Lot Cost method must support yield cost calculation for WIP batches as well" . I hope this is a must have functionality in OPM. In every manufacturing industry, it is not possible to complete or close all the batches within a period (the alternate cost period). Currently to get the yield lot cost, we need to Complete or Close the batch but ideally lot cost must not be depandant on batch status . In Actual costing, WIP batches also considered in yield cost calculation. The same feature must be available for lot costing as well. I would request all of you to vote this requirement so that this can be developed by